Skip to content
    Red Cedar Homes

    Red Cedar Homes

    What's Included in a New Construction Home Price, and What Isn't

    buyersNovember 3, 2026By Red Cedar Homes

    A new home's price covers the plan, the homesite, and the standard finishes. Here is what costs extra and what you pay at closing in the Carolinas.

    The short answer to what is included in new construction price: the house built to the plan you chose, on its homesite, at the builder's standard finish level, plus whatever the builder's written feature list names. Lot premiums, structural options, and design upgrades are usually priced on top. Closing costs, transfer taxes, escrow deposits, and items like window coverings sit outside the builder's price altogether.

    Ask for every one of those numbers in writing before you sign. Red Cedar Homes lists a stated price on each of its available homes, with options priced before contract.

    What is included in new construction price: the base price

    The base price is the price of the plan on a standard homesite with the standard specification. It is the number in the ad. What it covers depends on one document: the builder's included features list, sometimes called the standard specifications. If an item is not on that list, assume it is not in the price.

    On most builders' lists, the base price covers these items. Confirm each one on yours:

    • The structure: foundation, framing, roof, windows, exterior doors, and the standard exterior elevation shown for the plan.
    • Systems: heating and cooling, plumbing, and electrical, sized for the plan.
    • Standard interior finishes: flooring, cabinets, countertops, tile, fixtures, and trim at the builder's standard level.
    • Standard kitchen appliances, if the list names them. Check whether the refrigerator is on the list.
    • The builder's warranty, on the terms in the warranty document you receive.

    The model home is not the base price. Models usually show upgraded finishes and structural options. Ask the sales consultant which features in the model are standard and which carry a price.

    Lot premiums: what the homesite adds

    A lot premium is an added charge for a specific homesite. Builders charge premiums for size, view, privacy, orientation, a corner position, or a location close to an amenity. Two identical plans in the same community can carry different prices because of the lot alone.

    At Red Cedar, homesite selection is the first step. In weeks 1 and 2 of the Red Cedar buying process, the sales team reviews homesites, lot premiums, and orientation options with you before you pick a plan.

    Three questions to ask about any premium:

    1. Is the premium already inside the advertised price, or added to it?
    2. Does the lot need extra site work, such as a deeper foundation or retaining wall, and who pays for it?
    3. Is the premium shown as its own line on the purchase agreement?

    Options and upgrades: structural vs. design

    Options fall into two groups, and they lock at different times.

    • Structural options change the house itself: an added bedroom, a covered porch, an extended garage, a different elevation. They affect permits and framing, so they are chosen early and rarely change after contract.
    • Design selections change the finishes: flooring, cabinet style, countertops, tile, lighting, and hardware. They are chosen before the trades install them.

    Each option you add raises the contract price. Ask whether options require a separate deposit and whether that deposit is refundable. On Red Cedar homes, plan and selections come in weeks 2 to 4 and the contract in weeks 3 to 5, so the options are priced before you sign. Curated Homes come with a designer-curated interior finish package already chosen.

    Costs the builder's price may or may not cover

    These items are where two quotes for similar homes most often differ. None is always in or always out. Get a yes or no in writing for each:

    • Water and sewer connection fees. Utilities charge them when a new home connects. Charlotte Water's current rate schedule, effective July 1, 2026 through June 30, 2027, lists a $4,407 water connection fee plus system development fees of $1,453 for water and $5,066 for sewer on a 5/8 inch domestic meter. Each Carolinas utility sets its own. Ask whether the builder pays these fees and whether they are inside the price.
    • Refrigerator, washer, and dryer.
    • Window blinds or other window coverings.
    • Landscaping: sod or seed, how much of the yard, and irrigation.
    • Fencing, gutters, and the driveway width and material.
    • Garage door openers and the number of remotes.

    Costs outside the purchase price

    Even with every option priced, the contract price is not the cash you bring to closing. Plan for these:

    Closing costs

    Closing costs are the fees and other costs you pay to get your mortgage. Your lender must give you the Closing Disclosure at least three business days before closing, according to the Consumer Financial Protection Bureau. It shows your final loan terms, monthly payment, and closing costs. Compare it line by line with your Loan Estimate.

    Transfer taxes: South Carolina vs. North Carolina

    Both states tax the transfer of a deed, at different rates:

    • South Carolina: the deed recording fee is $1.85 for each $500 of value, made up of a $1.30 state portion and a $0.55 county portion, per the South Carolina Department of Revenue. On a $400,000 home, that is $1,480. Your contract says which party pays it.
    • North Carolina: the excise tax is $1 for each $500 of value, and the transferor (the seller) must pay it, under N.C. Gen. Stat. § 105-228.30. On a $400,000 home, that is $800.

    Escrow deposits and the first tax bill

    Lenders usually collect several months of property taxes and homeowners insurance at closing to fund your escrow account. On new construction, the closing-year tax bill may reflect only the lot or a partly built house, so the first full-year bill can be higher. In South Carolina, a primary home can qualify for a 4% assessment ratio instead of 6%, but only if you apply. Read how the South Carolina 4% property tax rate works and how to apply.

    HOA dues and fees

    If the community has a homeowners association, ask for the annual dues, any one-time fee charged to a buyer at closing, and the current budget. These are paid to the association, not the builder, and they are not in the home price.

    Move-in ready vs. to-be-built pricing

    The pricing questions change with the build stage:

    • Move-in ready home: the lot, plan, options, and finishes are already set. The price you see is the price of a finished house. Your job is to confirm what the feature list includes and plan for closing costs.
    • To-be-built home: you choose the lot, plan, and options, and the contract price grows with each choice. Your job is to get every option priced before you sign and to know which choices lock at which step.

    Red Cedar's to-be-built process runs about 24 weeks across seven steps, from homesite selection to closing. If you are still deciding between building and buying, compare new construction and existing homes side by side first.

    How to compare two builders' prices

    1. Get each builder's included features list for the exact plan and community.
    2. Write down the base price, the lot premium, and every option as separate lines.
    3. Mark each item from the "may or may not cover" list as in or out for each builder.
    4. Ask each lender for a Loan Estimate on the same loan type and down payment.
    5. Add transfer taxes, escrow deposits, and HOA fees.
    6. Compare the totals, not the advertised prices.

    Frequently asked questions

    Is the lot included in a new construction home price?

    Usually yes, when you buy from a builder in its community. The advertised price covers the house on a standard homesite. A homesite with more size, a better view, or a better orientation can carry a lot premium on top of that price. Ask whether the premium is already in the listed number or added to it, and check that it appears as its own line on the contract.

    Are closing costs included in new construction prices?

    No. Closing costs are paid at closing, separate from the contract price. Along with the other cash due at closing, they include lender fees, title and attorney costs, recording costs, and the escrow deposits your lender collects. Your Loan Estimate shows them early, and your Closing Disclosure shows the final figures at least three business days before closing. Some builders offer to pay part of them; get any offer in writing with its terms.

    Do new construction homes come with appliances?

    Most come with some kitchen appliances. The included features list tells you which ones. A range, dishwasher, and microwave are common inclusions, while the refrigerator, washer, and dryer are often left out. If the list does not name an appliance, assume you are buying it yourself and add it to your move-in budget before you compare homes.

    Is landscaping included in a new build?

    Some landscaping usually is, but the scope varies. One builder may sod the whole lot with irrigation, while another seeds the back yard and sods only the front. Ask for the landscaping specification in writing, including how much of the yard is covered, the plant list, and whether irrigation is included. Fencing is often a separate item.

    Begin the conversation

    Red Cedar Homes builds in Charlotte, Greenville, and Spartanburg with a stated price and options priced before contract. Browse the homes available now, see individual Curated Homes on their own homesites, or start with the floor plan library. When you are ready, contact the Red Cedar team or call 980-890-9381 and ask for the included features list on the home you like.

    Sources

    Figures as of October 2026. This is general information, not legal or tax advice. Talk to your attorney or CPA about your situation.

    #homebuyers#Carolinas#new construction pricing#closing costs

    Begin the Conversation

    Talk with Red Cedar Homes

    Tell us what you are looking for. Someone from our team will call you within one business day.

    CONTACT US